Consultancy, Supervision and Project Management Consultancy
Overall Total
                                        
                                            Total equivalent population (person) : 1000000
                                        
                                        
                                            Total plant flow (m³/day) : 135000
                                        
                        
                    
                            Project: Consulting Services For The Construction Supervision For R2 Reservoir
                        
                                
                                    Client : 
                                 
                                
                        
                            Description of The Work : 
                            
                    The scope of works for the contract includes construction of:
- Water storage reservoir with 135 ML water storage capacity and 163 m x 140 m x 6 m dimensions.
 - Overflow system
 - Pumping Station
 - Power transformers
 - Standbye power generation room
 - Fuel tanks building
 - Chlorination stationIrrigation pumping station
 - Valve chambers and connecting pipework
 - Pipework
 - Warehouse store
 - Guard house
 - Parking
 - Site roads and landscaping
 - Boundary roads and landscaping
 - Boundary roads and main gate
 - Residential building
 
The Supervision Phase of contract shall be divided in 3 phases/parts, as indicated below:
- Pre-Construction Phase (Start Up Phase) – Before Construction
 - Construction Phase (Construction Phase) – During Construction
	
- Task 1: Work Site Supervision
 - Task 2: Training and Capacity Building
 
 - Post-Construction Phase (Defect Liability Period)
 
Client: 
Mayoralty of Baghdad
Date:
26.04.2022 / Ongoing​
Total Project Cost:
€ 1.326.328,76