Wastewater Treatment Plants
Overall Total
                                        
                                            Total plant flow (m³/day) : 20000
                                        
                                        
                                            Total equivalent population (person) : 275000
                                        
                        
                    
                            Project: Technical Assistance and Supervision for Siverek Wastewater Project
                        
                                
                                    Client : 
                                 Ministry of Environment and Urbanization - Directorate of European Union Investments / Turkey
                                
                        
                            Description of The Work : 
                            
                    The city of Şanlıurfa is located in South-West of Turkey. There is no wastewater facility used in Siverek (a district of Şanlıurfa) which is based on engineering design. The wastewater and stormwater is collected in a combined manner and discharged to the dry river bed of Esmerçayı Creek.
The supervision service provides about the following items:
- Technical assistance and capacity building
 - Assessing the need for equipment
 - Construction Supervision of wastewater and storm water investments
 - Design review & supervision of construction of WWTP including sludge treatment and handling. The first stage will serve until 2025 and the second stage will be until 2040.
 - Civil and piping works of discharge line
 - Design flow rates and equivalent populations:
 
1st stage: Q=17.030 m3/day, 128.082 P.E.
2nd stage: Q=19.872 m3/day, 146.830 P.E.
- Supervision of construction of wastewater and storm water collectors and rehabilitation of Esmerçayı creek.
 - Construction Supervision of wastewater collection network 241 km and reinstatement of stone covered road surfaces
 - Construction Supervision of 1.500 m wastewater collector pipelines to the entrance of WWTP.
 - Construction Supervision of Esmerçayı Creek rehabilitation with length of 6 km (construction of a U-shaped open channel, box culvert and trapezoidal channel with approximately width of 4 m and depth of 3,3 m)
 - Construction Supervision of stormwater collection network 3.000 m.
 
Services:
- Technical assistance in the environment sector;
 - Supervision of wastewater system construction according to FIDIC conditions of contract;
 - Supervision of contractor’s detail design;
 - Capacity building and modernization of water utility department; development and improvement of institutional structures; training of personnel;
 - Technical assistance to the Municipality in institutional and financial aspects;
 - Regional experience particularly in Turkey;
 - Expertise in the implementation of EU funded projects.
 
Client: Ministry of Environment and Urbanization
Date: 2012 – ongoing
Total Service Cost: 228.000,00 EU
Capacity: 20.000 m3/day